HVAC COUNCIL
To develop and offer high quality programs and services all directly designed to enhance the businesses, markets, and profitability of SMACNA members performing HVAC work.
What's in the Latest Issue of HVAC Newsletter
|
| Fully welded round air-tight stainless steel distribution systems. |
How does a contractor install HVAC and plumbing equipment for a state-of-the-art, multi-use biological sciences building that contains complex challenges – including confined space for utility systems and limited access to equipment, all compounded by multiple laboratory systems, poured-in-place concrete construction, and tunnel corridor requirements?
read more
|
| Ductwork exits the unit room wall and branches up to the high bay area where the Orion capsule is housed. |
The National Aeronautics and Space Administration’s Operation and Checkout Building at the Kennedy Space Center in Cape Canaveral, Fla., recently underwent a face-lift thanks to SMACNA contractor Lapin Sheet Metal of Orlando, Fla. This historic facility will be used to house the new Orion spacecraft, America’s next generation of space exploration.
Lapin Sheet Metal provided all rectangular ductwork on the O and C Modernization Project, which was made of either single wall or double wall construction.
read more
Latest Issue