A SMACNA contractor wasn’t getting accurate labor coding from job sites so they couldn’t monitor job cost progress. A team made up of a cross-section of field, accounting and estimating personnel was created to analyze the problem and recommend a solution. The team’s solution was to modify work code numbers and make them project-specific. The codes to be used are identified during pre-job meetings.