J.F. Ahern: Prefab Time Lapse Video

J. F. Ahern Co. recently unveiled a time-lapse video that was filmed over several months, chronicling the assembly and installation of 32 multi-trade racking systems for the Froedtert CFAC project in Milwaukee.

Prefabrication is the process of construction and assembly of building components in an off-site, controlled, “factory” setting prior to installation at the jobsite / building location.

Who knew that prefabricated mechanical racking systems were so COOL? J. F. Ahern Co. recently unveiled a time-lapse video that was filmed over several months, chronicling the assembly and installation of 32 multi-trade racking systems for the Froedtert CFAC project in Milwaukee.

Content Reviewed 2/2021