New Technical Resource Bulletin (TRB)

From the Technical Resources Department. Update to the SMACNA HVAC Duct Construction Standards, Metal and Flexible, Fourth Edition, Figure 2-18 Corner Closures - Flanges.

 

This technical resources bulletin updates the language for corner fastening requirements used in conjunction with the T-25a and T-25b flanged transverse joint assembly.

TRB #01-25 Figure 2-18 Corner Closures - Flanges

Nov 24, 2025 Member Update

Latest Articles


2026 Washington DC Leadership Conference Recap

May 20, 2026 - Watch as SMACNA members interact with their Members of Congress as they work to advance our industry on The Hill!


Apply to Join the SMACNA Board of Directors

May 20, 2026 - There are 5 total openings, with four positions in the U.S. and one position in Western Canada (British Columbia).


Nominations Now Being Accepted for SMACNA Contractor of the Year

May 20, 2026 - Help highlight the work of a fellow SMACNA contractor whose dedication, innovation, and leadership have made a meaningful impact on our industry.